This employer's most recent OSHA inspection was in 2015. This data may not reflect current safety conditions.

Venegas Construction Safety Record

Ponce, PR · Construction

D

Historical grade based on past OSHA records. This employer has not been inspected in over 10 years.

Last inspected 05/22/2015

Based on public OSHA records. How is this calculated? · Data updated March 2026

According to OSHA enforcement records, Venegas Construction in Ponce, Puerto Rico has 102 workplace safety violations across 54 inspections, with 18 classified as serious and $18,851 in total penalties. Safety grade: D (above-average violations). OSHA records span 1980 to 2015.

Venegas Construction, located in Ponce, Puerto Rico, was last inspected by OSHA in 2015. While this employer's safety record is based on historical data that may not reflect current workplace conditions, the OSHA enforcement history remains part of the public record. Of the 102 violations on file, 18 were classified as serious — meaning OSHA determined they could cause death or serious physical harm to workers. Total penalties assessed were $18,851.

OSHA's enforcement records are maintained by the U.S. Department of Labor and cover workplace inspections dating back to the 1970s. An employer's safety grade is calculated using a weighted formula that accounts for the severity of violations — willful violations carry the highest weight (5x), followed by repeat (4x), serious (3x), and other (1x) violations per inspection. Learn more about how safety grades are calculated.

102 Violations
54 Inspections
18 Serious
$18,851 Penalties
Other-than-Serious?
69 ($1,300)
Serious?
18 ($12,455)
Repeat?
15 ($5,096)
1926.0451 Scaffolding
Cited in 8 inspections (16 total) since 1980
1926.0150 OSHA Standard
Cited in 7 inspections (7 total) since 1980
1926.0051 OSHA Standard
Cited in 5 inspections (6 total) since 1982
1926.0602 Excavations — Requirements
Cited in 5 inspections (6 total) since 1980
1926.0025 OSHA Standard
Cited in 4 inspections (5 total) since 1981
OSHA initially proposed $40,556 in penalties for Venegas Construction, later reduced to $18,851 — a 54% reduction through informal settlement or contest. Learn how OSHA penalties work.
1926.0451 Scaffolding
16 citations $6,780
1926.0150 OSHA Standard
7 citations
1926.0602 Excavations — Requirements
6 citations $340
1926.0051 OSHA Standard
6 citations $542
1926.0550 OSHA Standard
5 citations $1,155
DateTypeLocationViolationsPenalties
05/22/2015 Planned? Ponce, PR 0 $0
10/22/2014 Planned? Ponce, PR 0 $0
10/07/2014 Planned? Ponce, PR 0 $0
08/21/2014 Planned? Ponce, PR 0 $0
04/28/2014 Planned? Ponce, PR 0 $0
01/30/2014 Planned? Ponce, PR 0 $0
11/01/2013 Planned? Ponce, PR 2 $420
10/10/2013 Planned? Ponce, PR 0 $0
05/30/2013 Programmed Related? Ponce, PR 5 $825
02/18/2011 Planned? Ponce, PR 0 $0
01/28/2009 Planned? Ponce, PR 0 $0
12/12/2005 Planned? Ponce, PR 0 $0
02/20/2001 Planned? Ponce, PR 1 $0
11/29/2000 Planned? Ponce, PR 1 $542
06/08/2000 Planned? Ponce, PR 2 $2,900
03/09/2000 Planned? Ponce, PR 0 $0
09/16/1999 Accident? Ponce, PR 2 $1,820
06/21/1999 Planned? Ponce, PR 0 $0
02/02/1999 Planned? Ponce, PR 9 $2,800
10/06/1998 Planned? Ponce, PR 0 $0
11/06/1997 Planned? Ponce, PR 2 $3,250
09/11/1995 Planned? Ponce, PR 0 $0
08/31/1995 Planned? Ponce, PR 1 $438
04/19/1995 Planned? Ponce, PR 0 $0
01/11/1995 Planned? Ponce, PR 6 $2,496
09/27/1993 Planned? Ponce, PR 0 $0
05/24/1993 Planned? Ponce, PR 0 $0
03/10/1993 Planned? Ponce, PR 0 $0
10/28/1992 Planned? Ponce, PR 0 $0
07/13/1992 Programmed Related? Ponce, PR 0 $0
09/16/1991 Planned? Ponce, PR 1 $0
08/15/1990 Planned? Ponce, PR 3 $0
08/09/1990 Planned? Ponce, PR 5 $0
04/03/1990 Planned? Ponce, PR 1 $0
07/06/1989 Planned? Ponce, PR 0 $0
03/14/1988 Planned? Ponce, PR 1 $0
02/22/1988 Planned? Ponce, PR 3 $140
08/12/1987 Planned? Ponce, PR 1 $0
03/09/1987 Planned? Ponce, PR 5 $720
10/16/1986 Planned? Ponce, PR 2 $0
07/31/1986 Planned? Ponce, PR 6 $420
05/05/1986 Planned? Ponce, PR 5 $140
02/18/1986 Planned? Ponce, PR 2 $0
03/26/1985 Planned? Ponce, PR 0 $0
10/22/1984 Planned? Ponce, PR 0 $0
10/08/1984 Planned? Ponce, PR 3 $0
07/12/1984 Planned? Ponce, PR 0 $0
02/29/1984 Planned? Ponce, PR 7 $360
03/29/1982 Planned? Ponce, PR 3 $200
01/25/1982 Planned? Ponce, PR 3 $0
08/04/1981 Planned? Ponce, PR 7 $0
05/13/1981 Follow-Up? Ponce, PR 0 $0
04/20/1981 Planned? Ponce, PR 5 $1,100
09/30/1980 Planned? Ponce, PR 8 $280

Improve Your Safety Grade

Links may be affiliate-supported. This does not affect our safety ratings or recommendations.